Goodbye galley hatch!

The galley hatch has finally been removed from the deck to make way for the flooring in the Upper Saloon to go down. Air conditioning will be installed shortly so to provide additional ventilation for the galley.

Upper saloon roof gets a top coat

Upper Saloon Roof

After completion of the light tower renovations, before the glazing is installed, the Upper Saloon is ready to get a shiny top coat of fresh red paint!

As the roof is slightly curved, the new bright red roof – matching the light tower, it’s visible from the path and we think she looks great!